Project Description
Knaresborough Health & Wellbeing Centre
Knaresborough Health & Wellbeing Centre
This new build health and wellbeing centre was developed by Alliance Leisure through the UK Leisure Framework.
The centre delivers a range of wet and dry facilities for guests to enjoy.
These include:
- Six lane 25m pool
- Leisure pool with flume
- 60 station fitness suite
- Sauna and steam room
- Group fitness studio
- Immersive group cycling centre
- Café
Outside the building there is a children’s play area, car park with electric vehicle charging points and bicycle storage.
From the outset of the project the end client, Harrogate Borough Council, was driven to provide a building which was “as energy efficient as possible within the project budget” this allowed us to explore all available options for the building services solutions, the building, which achieved a BREEAM “Excellent” rating and an EPC “A” rating benefits from:
Air Source Heat Pumps providing heating and cooling throughout the building, LED lighting throughout, intelligent controls systems, roof mounted photovoltaic cells
We worked closely with ISG from RIBA Stage 2 and then with G&H Building Services from RIBA Stage 3 to completion
Project Details
Client: Alliance Leisure
Project Manager: Axiom
Architect: GT3 Architects
Main Contractor: ISG
MEP Contractor: G&H Building Services