Project Description

Knaresborough Health & Wellbeing Centre

Knaresborough Health & Wellbeing Centre

This new build health and wellbeing centre was developed by Alliance Leisure through the UK Leisure Framework.

The centre delivers a range of wet and dry facilities for guests to enjoy.

These include:

  • Six lane 25m pool
  • Leisure pool with flume
  • 60 station fitness suite
  • Sauna and steam room
  • Group fitness studio
  • Immersive group cycling centre
  • Café

Outside the building there is a children’s play area, car park with electric vehicle charging points and bicycle storage.

From the outset of the project the end client, Harrogate Borough Council, was driven to provide a building which was “as energy efficient as possible within the project budget” this allowed us to explore all available options for the building services solutions, the building, which achieved a BREEAM “Excellent” rating and an EPC “A” rating benefits from:

Air Source Heat Pumps providing heating and cooling throughout the building, LED lighting throughout, intelligent controls systems, roof mounted photovoltaic cells

We worked closely with ISG from RIBA Stage 2 and then with G&H Building Services from RIBA Stage 3 to completion

 

Project Details

Client: Alliance Leisure

Project Manager: Axiom

Architect: GT3 Architects

Main Contractor: ISG

MEP Contractor: G&H Building Services