Project Description
Doubletree by Hilton Hotel & Spa, Chester
Doubletree by Hilton Hotel & Spa, Chester
A phased development comprising of the refurbishment of the existing lobby to provide high end meeting spaces and a new reception area following by the construction of a new 79 bedroom wing on the existing site, the new hotel block was constructed over 3 floors with a detached plant area to the rear of the building, heating and cooling was provided via a hybrid vrf system with ventilation provided via room mounted heat recovery units. CGP | MEP provided the detailed design of the mechanical services for the design and build contractor